ICON adds panel installation to the project

June 10, 2015

As work continues on the 525,000 student residence project at 330 Phillip in Waterloo ICON has added the installation of over 1,700 panels to the Alder contract.  "The job is progressing well and with Alder controlling the majority use of the crane it made sense for us to support ICON with the panel installation.  We can integrate this into our current schedule ensuring the building envelope is enclosed on time" commented Matt Alder.